Contact information

Billing details


Additional information

Your order

Product Subtotal
Heavy Duty Crawler Excavator (50 Ton) – Smeaton Machinery  × 2 $ 640,000
Portable Concrete Mixer (Drum Type) – Smeaton Machinery  × 1 $ 2,300
50 Ton Truck Mounted Crane (Mobile Crane) – Smeaton Machinery  × 1 $ 180,000
3 Bedroom Low-Cost House Plan  × 1 $ 250
Dumuzas/Generic Corrugated Iron Sheet (Galvanized)  × 1 $ 12
Industrial Air Compressor (Horizontal Tank 200–500L) – Smeaton Machinery  × 1 $ 3,500
CHINT PVC Electrical Insulation Tape  × 1 $ 2
Hima Powercrete Cement – 50kg  × 1 $ 11
LED Panel Light 18W Round – Recessed Ceiling (Cool White)  × 1 $ 20
Fuel Tanker Truck – Heavy Duty Oil Transport Vehicle | Smeaton Machinery  × 1 $ 75,000
3 Bedroom Modern House Plan  × 2 $ 500
HOWO TX 460 Heavy Duty Truck (Tractor Head) – Smeaton Machinery  × 1 $ 55,000
Tororo Cement CEM IV (B-P) 32.5N – 50kg  × 1 $ 8
6-Way Extension Socket – Power Strip with Switch (13A, White)  × 1 $ 12
Single Drum Road Roller (Soil Compactor) – Smeaton Machinery  × 1 $ 75,000
Fuel Tanker Truck (10,000–20,000 Liters) – Smeaton Machinery  × 1 $ 90,000
3-Gang Wall Switch – Standard White (13A)  × 1 $ 8
Brick Red Box Profile Roofing Sheet (Roofing)  × 1 $ 17
Self-Loading Concrete Mixer – FIORI Mobile Mixer | Smeaton Machinery  × 2 $ 138,000
3 bedroom modern house design  × 1 $ 350
Heavy Duty Crawler Excavator (30 Ton) – Smeaton Machinery  × 1 $ 220,000
CAT Backhoe Loader (Multi-Purpose) – Smeaton Machinery  × 1 $ 84,000
Italtex Premium+ Triple Strength Tile Adhesive – 20kg  × 1 $ 14
Truck-Mounted Concrete Pump (Boom Pump) – Smeaton Machinery  × 1 $ 345,000
LED Ceiling Fan with Light – 48” Modern Design (Cool White / Remote Control)  × 1 $ 155
CHUI 32.5R Cement – 50kg  × 1 $ 10
Double Socket Outlet 13A – Switched Wall Socket (White)  × 1 $ 10
Rechargeable LED Work Light / Torch – Portable, 10W / 20W Options  × 1 $ 20
Industrial Silent Diesel Generator (100–200 kVA) – Smeaton Machinery  × 1 $ 25,000
Subtotal $ 1,934,199
Shipment
Total $ 1,934,249

  • VisaMasterCardAmexMTN Mobile Money - UGAirtel Money - UGEazzyPesapal E-wallet

error: Content is protected !!
Scroll to Top