|
NYATI 32.5R Cement – 50kg × 2 |
$ 17 |
|
Single Core Electrical Cable 2.5 mm² – PVC Insulated (Per Metre) × 1 |
$ 2 |
|
LED Bulb 9W Standard A19 – Warm White × 1 |
$ 5 |
|
Portable Concrete Mixer (Drum Type) – Smeaton Machinery × 2 |
$ 4,600 |
|
Miniature Circuit Breaker (MCB) 1P 16A – 6kA × 1 |
$ 15 |
|
Hima Fundi Cement – 50kg × 1 |
$ 8 |
|
Single Drum Road Roller (Soil Compactor) – Smeaton Machinery × 1 |
$ 75,000 |
|
Brass / Stainless Steel Threaded Pipe Union (Female-Female Connector) × 2 |
$ 14 |
|
Heavy Duty Plate Compactor (Vibratory Soil Compactor) – Smeaton Machinery × 1 |
$ 3,200 |
|
CAT Compact Track Loader (Skid Steer) – Smeaton Machinery × 1 |
$ 52,000 |
|
LED Flood Light 50W Outdoor – Cool White IP65 × 1 |
$ 36 |
|
Hima Rapidset 42.5R Cement – 50kg × 1 |
$ 11 |
|
Box Profile Roofing Sheet (Roofing) × 1 |
$ 23 |
|
Light Duty Flatbed Truck – Smeaton Machinery × 1 |
$ 27,000 |
|
3 bedroom modern house design × 1 |
$ 350 |
|
Italtex White Portland Cement (20kg) × 1 |
$ 13 |
|
Industrial Profile Roofing Sheets (Colored) × 1 |
$ 17 |
|
Versatile Tile Roofing Sheet (Roofing) × 1 |
$ 26 |
|
Roman Tile Roofing Sheet – Brown (Roofing) × 1 |
$ 26 |
|
Simba Power 42.5R Cement – 50kg × 1 |
$ 10 |
|
Box Profile Roofing Sheet – Blue (Roofing) × 2 |
$ 28 |
|
Simba Power 42.5N Cement – 50kg × 1 |
$ 10 |
|
Simba Cement 32.5R – 50kg × 1 |
$ 8 |
|
Lafarge Tector Cola Plus Tile Adhesive – 25kg × 1 |
$ 12 |
|
Tiger Tile Sheets (Red) × 1 |
$ 12 |
|
6-Way Extension Socket – Power Strip with Switch (13A, White) × 1 |
$ 12 |
|
CAT Double Drum Road Roller (Vibratory Compactor) – Smeaton Machinery × 1 |
$ 120,000 |
|
Modern 5 Bedroom Double Storey House Plans with Balcony and Family Lounge × 1 |
$ 450 |
|
NDOVU 42.5R OPC Cement – 50kg × 1 |
$ 10 |
|
Self-Loading Concrete Mixer – Smeaton Machinery × 1 |
$ 75,000 |
|
Green Industrial Roofing Sheet (Roofing) × 1 |
$ 16 |
|
Italtex Grout – 1kg × 1 |
$ 2 |
|
Maxcover 28G Tile Red Plain Roofing Sheet × 1 |
$ 13 |
|
50 Ton Truck Mounted Crane (Mobile Crane) – Smeaton Machinery × 2 |
$ 360,000 |
|
KIFARU 42.5R Cement – 50kg × 1 |
$ 10 |
|
4 Bedroom Luxury House Plan × 1 |
$ 300 |
|
Burnt Clay Brick × 1 |
$ 0 |
|
JCB Telehandler – Heavy Duty Telescopic Loader Smeaton Machinery × 1 |
$ 89,000 |
|
CAT Backhoe Loader (Multi-Purpose) – Smeaton Machinery × 1 |
$ 84,000 |
|
Tororo Cement CEM II B(P) 32.5N – Portland Pozzolana Cement (PPC) 50kg × 1 |
$ 8 |
|
Industrial Air Compressor (Horizontal Tank 200–500L) – Smeaton Machinery × 1 |
$ 3,500 |
|
Modern Double Storey Residential House Plan × 1 |
$ 450 |
|
4-Bedroom Double-Storey House Plan × 1 |
$ 450 |
|
Fuel Tanker Truck (10,000–20,000 Liters) – Smeaton Machinery × 1 |
$ 90,000 |