Contact information

Billing details


Additional information

Your order

Product Subtotal
Heavy Duty Crawler Excavator (50 Ton) – Smeaton Machinery  × 2 $ 640,000
Portable Concrete Mixer (Drum Type) – Smeaton Machinery  × 1 $ 2,300
50 Ton Truck Mounted Crane (Mobile Crane) – Smeaton Machinery  × 1 $ 180,000
3 Bedroom Low-Cost House Plan  × 2 $ 500
Dumuzas/Generic Corrugated Iron Sheet (Galvanized)  × 1 $ 12
Industrial Air Compressor (Horizontal Tank 200–500L) – Smeaton Machinery  × 1 $ 3,500
CHINT PVC Electrical Insulation Tape  × 1 $ 2
Hima Powercrete Cement – 50kg  × 1 $ 11
LED Panel Light 18W Round – Recessed Ceiling (Cool White)  × 3 $ 59
Fuel Tanker Truck – Heavy Duty Oil Transport Vehicle | Smeaton Machinery  × 1 $ 75,000
3 Bedroom Modern House Plan  × 2 $ 500
HOWO TX 460 Heavy Duty Truck (Tractor Head) – Smeaton Machinery  × 1 $ 55,000
Tororo Cement CEM IV (B-P) 32.5N – 50kg  × 1 $ 8
6-Way Extension Socket – Power Strip with Switch (13A, White)  × 1 $ 12
Single Drum Road Roller (Soil Compactor) – Smeaton Machinery  × 1 $ 75,000
Fuel Tanker Truck (10,000–20,000 Liters) – Smeaton Machinery  × 1 $ 90,000
3-Gang Wall Switch – Standard White (13A)  × 1 $ 8
Brick Red Box Profile Roofing Sheet (Roofing)  × 1 $ 17
Self-Loading Concrete Mixer – FIORI Mobile Mixer | Smeaton Machinery  × 3 $ 207,000
3 bedroom modern house design  × 2 $ 700
Heavy Duty Crawler Excavator (30 Ton) – Smeaton Machinery  × 2 $ 440,000
CAT Backhoe Loader (Multi-Purpose) – Smeaton Machinery  × 2 $ 168,000
Italtex Premium+ Triple Strength Tile Adhesive – 20kg  × 2 $ 28
Truck-Mounted Concrete Pump (Boom Pump) – Smeaton Machinery  × 2 $ 690,000
LED Ceiling Fan with Light – 48” Modern Design (Cool White / Remote Control)  × 2 $ 310
CHUI 32.5R Cement – 50kg  × 1 $ 10
Double Socket Outlet 13A – Switched Wall Socket (White)  × 1 $ 10
Rechargeable LED Work Light / Torch – Portable, 10W / 20W Options  × 1 $ 20
Industrial Silent Diesel Generator (100–200 kVA) – Smeaton Machinery  × 2 $ 50,000
Farm Tractor (40–50 HP) – Smeaton Machinery  × 1 $ 25,000
Heavy Duty Concrete Mixer Truck – Smeaton Machinery  × 2 $ 248,000
Simba Power 42.5R Cement – 50kg  × 1 $ 10
4 Bedroom Luxury House Plan  × 1 $ 300
HOWO 6×4 Dump Truck (Tipper Truck) – Smeaton Machinery  × 3 $ 195,000
4-Bedroom Double-Storey House Plan  × 1 $ 450
Miniature Circuit Breaker (MCB) 1P 16A – 6kA  × 1 $ 15
IT4/IT5 Woodlike Iron Sheets  × 1 $ 14
Hima Minecem Sulphate Resistant Cement – 50kg  × 1 $ 11
CAT Compact Track Loader (Skid Steer) – Smeaton Machinery  × 1 $ 52,000
CAT Double Drum Road Roller (Vibratory Compactor) – Smeaton Machinery  × 1 $ 120,000
Light Duty Flatbed Truck – Smeaton Machinery  × 1 $ 27,000
Resincot 28G Charcoal Plain Roofing Sheet  × 1 $ 13
Solar Street Light 200W – All-in-One LED with Motion Sensor (IP65)  × 1 $ 220
Smart Wi-Fi Wall Switch – 1/2 Gang, Works with Alexa & Google Home  × 1 $ 48
JCB Telehandler – Heavy Duty Telescopic Loader Smeaton Machinery  × 1 $ 89,000
Italtex Super Grout Tile Grout 10kg  × 1 $ 5
Italtex Waterproof Powder – 500g  × 1 $ 2
Orientile 28G Potters Clay Matt Roofing Sheet  × 1 $ 15
Subtotal $ 3,435,110
Shipment
Total $ 3,435,160

  • VisaMasterCardAmexMTN Mobile Money - UGAirtel Money - UGEazzyPesapal E-wallet

error: Content is protected !!
Scroll to Top