Contact information

Billing details


Additional information

Your order

Product Subtotal
NYATI 32.5R Cement – 50kg  × 1 $ 8
Single Core Electrical Cable 2.5 mm² – PVC Insulated (Per Metre)  × 1 $ 2
LED Bulb 9W Standard A19 – Warm White  × 1 $ 5
Portable Concrete Mixer (Drum Type) – Smeaton Machinery  × 2 $ 4,600
Miniature Circuit Breaker (MCB) 1P 16A – 6kA  × 1 $ 15
Hima Fundi Cement – 50kg  × 1 $ 8
Single Drum Road Roller (Soil Compactor) – Smeaton Machinery  × 1 $ 75,000
Brass / Stainless Steel Threaded Pipe Union (Female-Female Connector)  × 1 $ 7
Heavy Duty Plate Compactor (Vibratory Soil Compactor) – Smeaton Machinery  × 1 $ 3,200
CAT Compact Track Loader (Skid Steer) – Smeaton Machinery  × 1 $ 52,000
LED Flood Light 50W Outdoor – Cool White IP65  × 1 $ 36
Hima Rapidset 42.5R Cement – 50kg  × 1 $ 11
Box Profile Roofing Sheet (Roofing)  × 1 $ 23
Light Duty Flatbed Truck – Smeaton Machinery  × 1 $ 27,000
3 bedroom modern house design  × 1 $ 350
Italtex White Portland Cement (20kg)  × 1 $ 13
Industrial Profile Roofing Sheets (Colored)  × 1 $ 17
Versatile Tile Roofing Sheet (Roofing)  × 1 $ 26
Roman Tile Roofing Sheet – Brown (Roofing)  × 1 $ 26
Simba Power 42.5R Cement – 50kg  × 1 $ 10
Box Profile Roofing Sheet – Blue (Roofing)  × 2 $ 28
Simba Power 42.5N Cement – 50kg  × 1 $ 10
Simba Cement 32.5R – 50kg  × 1 $ 8
Lafarge Tector Cola Plus Tile Adhesive – 25kg  × 1 $ 12
Tiger Tile Sheets (Red)  × 1 $ 12
6-Way Extension Socket – Power Strip with Switch (13A, White)  × 1 $ 12
CAT Double Drum Road Roller (Vibratory Compactor) – Smeaton Machinery  × 1 $ 120,000
Subtotal $ 282,439
Shipment
Total $ 282,489

  • VisaMasterCardAmexMTN Mobile Money - UGAirtel Money - UGEazzyPesapal E-wallet

error: Content is protected !!
Scroll to Top