Contact information

Billing details


Additional information

Your order

Product Subtotal
Covermax 30G Plain Roofing Sheet – Brick Red  × 1 $ 13
50 Ton Truck Mounted Crane (Mobile Crane) – Smeaton Machinery  × 3 $ 540,000
Crawler Bulldozer (Medium–Heavy Duty) – Smeaton Machinery  × 1 $ 160,000
Box Profile Roofing Sheet (Roofing)  × 1 $ 23
CHUI 32.5R Cement – 50kg  × 1 $ 10
20×26 FT Heavy Duty Metal Carport – 2 Car Steel Garage Shelter  × 1 $ 4,990
Fuel Tanker Truck – Heavy Duty Oil Transport Vehicle | Smeaton Machinery  × 1 $ 75,000
3 Bedroom Low-Cost House Plan  × 2 $ 500
CAT Large Wheel Loader (Heavy Duty) – Smeaton Machinery  × 2 $ 970,000
3 bedroom modern house design  × 1 $ 350
CAT Compact Track Loader (Skid Steer) – Smeaton Machinery  × 3 $ 156,000
Box Profile Roofing Sheet (Roofing)  × 2 $ 43
Brick Red Box Profile Roofing Sheet (Roofing)  × 1 $ 17
6-Way Extension Socket – Power Strip with Switch (13A, White)  × 1 $ 12
3-Gang Wall Switch – Standard White (13A)  × 1 $ 8
Farm Tractor (40–50 HP) – Smeaton Machinery  × 1 $ 25,000
18×20 FT Metal Carport – Heavy Duty Steel Parking Shelter  × 1 $ 3,250
Subtotal $ 1,935,216
Shipment
Total $ 1,935,266

  • VisaMasterCardAmexMTN Mobile Money - UGAirtel Money - UGEazzyPesapal E-wallet

error: Content is protected !!
Scroll to Top