Contact information

Billing details


Additional information

Your order

Product Subtotal
50 Ton Truck Mounted Crane (Mobile Crane) – Smeaton Machinery  × 2 $ 360,000
Basco Value Permalast Plus Emulsion – 20 Litres (White)  × 1 $ 22
6-Way Extension Socket – Power Strip with Switch (13A, White)  × 1 $ 12
CAT Double Drum Road Roller (Vibratory Compactor) – Smeaton Machinery  × 2 $ 240,000
CAT Large Wheel Loader (Heavy Duty) – Smeaton Machinery  × 1 $ 485,000
CAT Compact Track Loader (Skid Steer) – Smeaton Machinery  × 2 $ 104,000
3-Gang Wall Switch – Standard White (13A)  × 1 $ 8
CAT Backhoe Loader (Multi-Purpose) – Smeaton Machinery  × 1 $ 84,000
3 bedroom modern house design  × 1 $ 350
3 Bedroom Low-Cost House Plan  × 1 $ 250
Farm Tractor (40–50 HP) – Smeaton Machinery  × 1 $ 25,000
2-Bedroom House Plan Modern Residential Design  × 1 $ 250
3 Bedroom Duplex House Plan  × 1 $ 250
Crawler Bulldozer (Medium–Heavy Duty) – Smeaton Machinery  × 1 $ 160,000
Subtotal $ 1,459,142
Shipment
Total $ 1,459,192

  • VisaMasterCardAmexMTN Mobile Money - UGAirtel Money - UGEazzyPesapal E-wallet

error: Content is protected !!
Scroll to Top