|
Heavy Duty Crawler Excavator (50 Ton) – Smeaton Machinery × 2 |
$ 640,000 |
|
Portable Concrete Mixer (Drum Type) – Smeaton Machinery × 1 |
$ 2,300 |
|
50 Ton Truck Mounted Crane (Mobile Crane) – Smeaton Machinery × 1 |
$ 180,000 |
|
3 Bedroom Low-Cost House Plan × 2 |
$ 500 |
|
Dumuzas/Generic Corrugated Iron Sheet (Galvanized) × 1 |
$ 12 |
|
Industrial Air Compressor (Horizontal Tank 200–500L) – Smeaton Machinery × 1 |
$ 3,500 |
|
CHINT PVC Electrical Insulation Tape × 1 |
$ 2 |
|
Hima Powercrete Cement – 50kg × 1 |
$ 11 |
|
LED Panel Light 18W Round – Recessed Ceiling (Cool White) × 3 |
$ 59 |
|
Fuel Tanker Truck – Heavy Duty Oil Transport Vehicle | Smeaton Machinery × 1 |
$ 75,000 |
|
3 Bedroom Modern House Plan × 2 |
$ 500 |
|
HOWO TX 460 Heavy Duty Truck (Tractor Head) – Smeaton Machinery × 1 |
$ 55,000 |
|
Tororo Cement CEM IV (B-P) 32.5N – 50kg × 1 |
$ 8 |
|
6-Way Extension Socket – Power Strip with Switch (13A, White) × 1 |
$ 12 |
|
Single Drum Road Roller (Soil Compactor) – Smeaton Machinery × 1 |
$ 75,000 |
|
Fuel Tanker Truck (10,000–20,000 Liters) – Smeaton Machinery × 1 |
$ 90,000 |
|
3-Gang Wall Switch – Standard White (13A) × 1 |
$ 8 |
|
Brick Red Box Profile Roofing Sheet (Roofing) × 1 |
$ 17 |
|
Self-Loading Concrete Mixer – FIORI Mobile Mixer | Smeaton Machinery × 3 |
$ 207,000 |
|
3 bedroom modern house design × 2 |
$ 700 |
|
Heavy Duty Crawler Excavator (30 Ton) – Smeaton Machinery × 2 |
$ 440,000 |
|
CAT Backhoe Loader (Multi-Purpose) – Smeaton Machinery × 2 |
$ 168,000 |
|
Italtex Premium+ Triple Strength Tile Adhesive – 20kg × 2 |
$ 28 |
|
Truck-Mounted Concrete Pump (Boom Pump) – Smeaton Machinery × 2 |
$ 690,000 |
|
LED Ceiling Fan with Light – 48” Modern Design (Cool White / Remote Control) × 1 |
$ 155 |
|
CHUI 32.5R Cement – 50kg × 1 |
$ 10 |
|
Double Socket Outlet 13A – Switched Wall Socket (White) × 1 |
$ 10 |
|
Rechargeable LED Work Light / Torch – Portable, 10W / 20W Options × 1 |
$ 20 |
|
Industrial Silent Diesel Generator (100–200 kVA) – Smeaton Machinery × 2 |
$ 50,000 |
|
Farm Tractor (40–50 HP) – Smeaton Machinery × 1 |
$ 25,000 |
|
Heavy Duty Concrete Mixer Truck – Smeaton Machinery × 1 |
$ 124,000 |
|
Simba Power 42.5R Cement – 50kg × 1 |
$ 10 |
|
4 Bedroom Luxury House Plan × 1 |
$ 300 |
|
HOWO 6×4 Dump Truck (Tipper Truck) – Smeaton Machinery × 2 |
$ 130,000 |
|
4-Bedroom Double-Storey House Plan × 1 |
$ 450 |
|
Miniature Circuit Breaker (MCB) 1P 16A – 6kA × 1 |
$ 15 |
|
IT4/IT5 Woodlike Iron Sheets × 1 |
$ 14 |
|
Hima Minecem Sulphate Resistant Cement – 50kg × 1 |
$ 11 |
|
CAT Compact Track Loader (Skid Steer) – Smeaton Machinery × 1 |
$ 52,000 |
|
CAT Double Drum Road Roller (Vibratory Compactor) – Smeaton Machinery × 1 |
$ 120,000 |
|
Light Duty Flatbed Truck – Smeaton Machinery × 1 |
$ 27,000 |
|
Resincot 28G Charcoal Plain Roofing Sheet × 1 |
$ 13 |
|
Solar Street Light 200W – All-in-One LED with Motion Sensor (IP65) × 1 |
$ 220 |